We recently installed a stormwater drainage system to deal with excess rainwater and groundwater, to prevent flooding. The project involved the use of traditional soak rings so it was quite an extensive process as you can see from the pictures below. The soakrings were delivered and unloading was a bit of a mission in a tight space - this was followed by some serious excavation work.
All of this was undertaken with a view to getting the job done as quickly and efficiently as possible so as to cause as little disruption as possible.
142 Comments
|
News @ TmHere's what we've been doing lately - if you see something you like get in touch. ArchivesCategories
All
|